Skip to content
Fall baking season is here · Free local delivery on $250+ in MA & $500+ in RI, NH & ME · Warehouse pickup in Brockton · Shipping chocolate? Add insulated shipping.
Fall baking season is here · Free local delivery $250+ MA · $500+ RI, NH & ME · Pickup in Brockton
Bundle & Save Build your bundle

NV45B4FE3T Vertical Pump

Sold out
Original price $6,055.00 - Original price $6,055.00
Original price
$6,055.00
$6,055.00 - $6,055.00
Current price $6,055.00
Availability:
Out of stock

Bundle & Save

Build your bundle

Mix any items, any size. Applied automatically at checkout on one-time purchases; not combined with Subscribe & Save.

Estimated delivery

Estimate only
Shipping policy

  1. Order today
  2. Packed & shipped
  3. At your door

Need it by a certain date?

Message us before you order. We'll flag it and keep an eye on it until it ships.

Mon–Fri 8am–3pm ET

EMPTY DOM REMOVE PROTECTOR
SKU sku-42923631935581
EMPTY DOM REMOVE PROTECTOR

Product Description

The NV45B4FE3T Vertical Pump is a reliable and high-performing booster pump designed for demanding industrial, commercial, and agricultural applications. Its vertical, in-line design saves space while providing robust performance and easy integration into existing systems.

Equipped with a 3 HP, three-phase motor, this pump delivers a flow rate of up to 45 GPM and a maximum pressure of 232 PSI. Constructed from durable 304 stainless steel, the NV45B4FE3T resists corrosion and ensures a long service life even in challenging environments. It also features maintenance-free cartridge mechanical seals and ANSI standard flanged connections for easy installation and maintenance.

Certified to meet NSF/ANSI 61 and 372 standards, the NV45B4FE3T is perfect for reverse osmosis, water boosting, filtration systems, hot and cold water circulation, and sprinkler systems.

###

###

###

Installation Instructions for NV45B4FE3T Vertical Pump

  1. Preparation:
    • Inspect the pump and motor for any visible damage during shipping. Report any damage to the carrier or dealer.
    • Ensure the installation site is level, stable, and provides adequate space and ventilation for service and cooling.
    • Verify that the pump model matches the system specifications and is suitable for the intended application.
  2. Mounting the Pump:
    • Secure the pump base to a flat, solid surface to prevent vibration during operation.
    • Align and support suction and discharge piping to avoid excessive strain on the pump.
    • Install isolation valves on both the suction and discharge sides for easier maintenance.
  3. Piping Connections:
    • Ensure piping matches the pump’s flanged connections (2" ANSI 150#).
    • Install appropriate gaskets to prevent leaks, ensuring they do not restrict flow.
    • Remove any protective covers or caps from the flanges before installation.
    • For hot water systems, include a bleed valve in the discharge line to relieve pressure during maintenance.
  4. Electrical Connection:
    • Have a certified electrician verify that the power supply matches the motor’s specifications (3 HP, three-phase).
    • Ensure proper motor wiring and check for counterclockwise rotation when viewed from the motor’s rear.
    • If rotation is incorrect on a three-phase motor, reverse any two leads to correct it.
  5. Priming the Pump:
    • Remove the fill plug and use a funnel to fill the pump casing with water.
    • Open the vent plug to allow air to escape as the pump fills with water.
    • Re-seal the vent plug and fill plug once a steady stream of water flows from the vent.
  6. Testing the Pump:
    • Open the suction valve fully and partially open the discharge valve.
    • Apply power to the motor and check for smooth operation without unusual noise or vibration.
    • Gradually open the discharge valve to reach desired operating conditions.
  7. Safety Precautions:
    • Never operate the pump without water to prevent damage to internal components.
    • Always replace coupling guards after installation to prevent injuries.
    • Ensure the pump is properly grounded and all connections are secure before starting.

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare
DESCRIPTION

Product Description

The NV45B4FE3T Vertical Pump is a reliable and high-performing booster pump designed for demanding industrial, commercial, and agricultural applications. Its vertical, in-line design saves space while providing robust performance and easy integration into existing systems.

Equipped with a 3 HP, three-phase motor, this pump delivers a flow rate of up to 45 GPM and a maximum pressure of 232 PSI. Constructed from durable 304 stainless steel, the NV45B4FE3T resists corrosion and ensures a long service life even in challenging environments. It also features maintenance-free cartridge mechanical seals and ANSI standard flanged connections for easy installation and maintenance.

Certified to meet NSF/ANSI 61 and 372 standards, the NV45B4FE3T is perfect for reverse osmosis, water boosting, filtration systems, hot and cold water circulation, and sprinkler systems.

###

###

###

Installation Instructions for NV45B4FE3T Vertical Pump

  1. Preparation:
    • Inspect the pump and motor for any visible damage during shipping. Report any damage to the carrier or dealer.
    • Ensure the installation site is level, stable, and provides adequate space and ventilation for service and cooling.
    • Verify that the pump model matches the system specifications and is suitable for the intended application.
  2. Mounting the Pump:
    • Secure the pump base to a flat, solid surface to prevent vibration during operation.
    • Align and support suction and discharge piping to avoid excessive strain on the pump.
    • Install isolation valves on both the suction and discharge sides for easier maintenance.
  3. Piping Connections:
    • Ensure piping matches the pump’s flanged connections (2" ANSI 150#).
    • Install appropriate gaskets to prevent leaks, ensuring they do not restrict flow.
    • Remove any protective covers or caps from the flanges before installation.
    • For hot water systems, include a bleed valve in the discharge line to relieve pressure during maintenance.
  4. Electrical Connection:
    • Have a certified electrician verify that the power supply matches the motor’s specifications (3 HP, three-phase).
    • Ensure proper motor wiring and check for counterclockwise rotation when viewed from the motor’s rear.
    • If rotation is incorrect on a three-phase motor, reverse any two leads to correct it.
  5. Priming the Pump:
    • Remove the fill plug and use a funnel to fill the pump casing with water.
    • Open the vent plug to allow air to escape as the pump fills with water.
    • Re-seal the vent plug and fill plug once a steady stream of water flows from the vent.
  6. Testing the Pump:
    • Open the suction valve fully and partially open the discharge valve.
    • Apply power to the motor and check for smooth operation without unusual noise or vibration.
    • Gradually open the discharge valve to reach desired operating conditions.
  7. Safety Precautions:
    • Never operate the pump without water to prevent damage to internal components.
    • Always replace coupling guards after installation to prevent injuries.
    • Ensure the pump is properly grounded and all connections are secure before starting.
SHIPS FROM